Draft ideas...
Draft Photos
|
We took some photos of our draft performance, showing what we were doing and some behind the scenes shots, for our real finial opening sequence we will be in a different location, as we have seen from our draft we need to do some changes. |
Music
|
Here are some ideas for the background music for our opening sequence, we chose these to create a good feel in the sequence and also create a feel of mystery and an eery feel.
|
|
These are the 3 clips we chose and we will next narrowing it down, to come up with a final decision.
|
Draft
|
This is our draft piece and our draft piece with our edited credits, we are aware we need to make some changes, however we have the basic story line.
|
|
Credits and editing
The credits we used are created on Photoshop using different layers to move the words around and then edited together on Windows Live Movie Maker
when editing our opening sequence we tried to use an antique look and a black and gloomy tone, this helps with our genre and the over all feel of the film. next we decided to change the speed of the sequence, we sped it up and slowed it down to create an interest in the audience. we also used alot of dulling down techniques especially the last outside shot as the sun was very bright. We are also using cuts and jump cuts as a well as pull focus's to show the cuts.
Behind the scenes
Here are some of our behind the scene footage. Behind the scenes of our draft and opening sequence, the audition video go to 2 minutes 6 seconds to see behind the scenes.
The camera techniques and camera shots we used are as followed
The camera techniques and camera shots we used are as followed
- one shot
- establishing shot
- close up
- ex close up
- p.o.v
- eye-line
- match on match action
- high angle
- low angle
- pull focus
- low key lighting
- high key lighting
- over the shoulder
- mid shot
- zoom out
- zoom in
|
|
Bloopers
Ive put a few blooper reels in the blog from the audition phase
|
|
Filming schedule
19th november we filmed our production meeting
26th november we filmed our meeting on our storyboard
19th jan we filmed our audition and screen tests
23rd march we filmed our draft
12th april we filmed our main part of our opening sequence
14th april we our second part of our opening sequence
26th april we filmed and edited our audience feedback
26th november we filmed our meeting on our storyboard
19th jan we filmed our audition and screen tests
23rd march we filmed our draft
12th april we filmed our main part of our opening sequence
14th april we our second part of our opening sequence
26th april we filmed and edited our audience feedback
Audience Feedback
We created what we thought was going to be our final draft and then filmed some audience feedback, after listening to the feedback and taking into account what everyone said we made some slight changes and the final piece is on my first blog page. In editing we sped up the audience feedback quite a bit when watching the audience is watching the videos this was just because we didn't want the video to drag out. The video to left was out sequence that they reacted to.
|
|